Latest post Mon, Mar 12 2018 8:09 PM by mpa10e. 0 replies.
Page 1 of 1 (1 items)
Sort Posts: Previous Next
  • Mon, Mar 12 2018 8:09 PM

    • mpa10e
    • Not Ranked
    • Joined on Mon, Mar 12 2018
    • Posts 1
    • Points 5

    Having modified Subclips relink/replace old subclips in timeline

    Hello all!

     

    I am organizing a project and creating dailies sequences for each day of shooting. I'm syncing video and audio, making those into subclips and laying those out on the timeline. 

    I orginally made my synced clips with all 7 tracks of audio (lavs, boom, mix) but my editor only wants the L+R mix tracks on the timeline, with the option to match back to the 7 tracks whenever he might need to. 

    2 questions: 

    1) How should I make the subclips to ensure that they will only have L+R mix tracks (A1 + A2) but still match back to full A7 audio tracks?

    2) Once I make these new subclips for each clip, is there a way to link the modified subclips to the old subclips in my dailies assembly? It would be rough to go through every clip and bring it back into the timeline. 

     

    Thanks so much!

    Filed under:
Page 1 of 1 (1 items)

© Copyright 2011 Avid Technology, Inc.  Terms of Use |  Privacy Policy |  Site Map |  Find a Reseller